10/20/2023 0 Comments Tandem crane lift plan![]() ![]() ![]() The rail was designed to haul out the massive 750-US ton (680 metric ton) Mount Washington ship that also sails on Lake Winnipesaukee. The first order of business was the inspection and repair work necessary for the vessel. The Doris was out of the water at the time prior to the lift on a maintenance rail that the Winnipesaukee Flagship Corp.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |